Mihaly International Schedule Tracking System


This project was extremely enjoyable. As the project manager, systems designer, and software engineer, it was designed and built by me in 6 months.


Goals Achieved:

  • Built a reliable schedule tracking system that will keep track of approximately 200 mailings per year, with the ability to handle larger volumes as new clients are solicited.
  • New system consists of both back-end and front-end databases to optimize performance caused by network traffic.
  • The back-end database is engineered to accommodate multi-users via the existing local area network.
  • The front-end user interface consists of one data entry form and numerous reports. All existing paper reports will be replaced by this new system (although paper versions can easily be generated.)
  • All reports generated by the new system will contain an “as of date” field and can be easily exported into PDF format for emailing to internal/external users (e.g., writers, clients).
  • Installation CD-ROMs have been created, consisting of setup files for easy deployment.
  • Utilized existing Microsoft Windows XP, Access 2003 environment.

Project Plan:



Project Details (with screen shots):







 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this post.
Comments
  • No comments exist for this post.
Leave a comment

Submitted comments are subject to moderation before being displayed.

 Name (required)

 Email (will not be published) (required)

Your comment is 0 characters limited to 3000 characters.